U.S. Army Soldiers construct Improved Ribbon Bridge (IRB) with Mk2 Bridge Erection Boat to transport various military vehicles across a river.
The Improved Ribbon Bridge is used to transport weapon systems, troops and supplies over water when permanent bridges are not available.
The Soldiers are with the 200th Engineer Multi-Role Bridge Company.